The thor laser series of machinery installation requirements and equipment method have?

position: home >> News >> Industry Dynamic

The thor laser series of machinery installation requirements and equipment method have?

pubdate:2016-09-29 00:00 source:http://www.leishenlaser.com clicks:

The thor series laser machine installation requirements:

The machine should be installed behind the strong working mesa, should be set aside 150 mm clearance. And make sure that the top of the machine can open the exhaust.

Air filter of the air inlet and air supply should be installed air filter, another to ensure clean and dry air supply, prolong the service life of pneumatic components.

Machine use 220 v ac power, high to the requirement of power supply, power supply voltage instability, will directly affect the effect of welding. In voltage instability region, to configure the voltage stabilizer, required voltage regulator output voltage fluctuation is less than 2%, double the rated power output power should be a machine.

Before using the machines must be well earthed, grounding resistance should be less than 4 ohm, no perfect street grounding is strictly prohibited!

Transducer system in the factory has good assembly and debugging, if need to replace welding mold, or any part, can use random allocation hook spanner remove, and then reassemble.

Thor series laser machinery detailed assembly method is as follows:

First assembly welding mode and the amplitude, the screw tip at one end of the first lock on the welding mode, on the luffing rod and welding connection at one end with solvent clean clean, coated with a thin layer of coupling agent (not easy dry silicon grease), then use the random allocation hook spanner, locked horns are tight on the welding mould.

After good welding die. According to the above method, the screw tip at one end of the first lock on the amplitude, the amplitude and the transducer face coated with coupling agent, and then put the transducer lock on the amplitude.

Torque transducer system installation to appropriate, usually hold the end of the hook spanner to twist. Note: do not try to end after wrench lever, so as not to force too much damage to the screw tooth.